1 Akshay S Kulkarni / Manager (C) -FTP ( 10/09/2019 02:32 ) NPCIL welcomes all the bidders for the Pre-Bid meeting of the subject tender. Bidders can now ask their queries.
2 Akshay S Kulkarni / Manager (C) -FTP ( 10/09/2019 02:32 ) All bidders are requested to kindly note that the final replies to queries of all the bidders will be uploaded as Pre-bid response which only shall prevail and form the part of the subject Tender.
3 1. Walchandnagar industries Ltd ( 10/09/2019 02:44 ) 1)1.0 scope of supply:102. KK34.UJC.JNB5080.TH.TS. PR001 Drawing Sheet 4 / 4 of duct assembly, Annexure-III, Page 6 of 23: Please specify the types of gland packaging.Scope of supply considered for the items as per table-1 and table-2. Items mentioned at table-3 are not considered in the scope of supply. The air duct assembly modules will be manufactured as per drawing and trial assembled at workshop (12 air ducts per reactor). After assembly trials the modules will be separated and transported to site. Unloading of items at site is considered in scope of NPCIL.Please confirm.Clip band will be supplied as separate entity. Please confirm.
4 2. Walchandnagar industries Ltd ( 10/09/2019 02:45 ) 2)1.0 scope of supply:Drawing : air duct transitional member (sheet ½):Please confirm whether mounting elements of duct on to the dome are in the scope of supply or not. If yes, grades and dimensions of items like 14 & 15 to be specified by NPCIL. As these are integral to foundation on civil structure, these may be part of supply of foundation elements and taken out of scope of present tender. Please clarify.
5 3. Walchandnagar industries Ltd ( 10/09/2019 02:46 ) 3)Para 4.3 page 3/9:Insulation duct strap bend clip:Please provide the weight / density and thickness of insulation.
6 4. Walchandnagar industries Ltd ( 10/09/2019 02:47 ) 4)Para 4.4:Flange analysis:Stress will be checked against limits as per ASME III NC. Please confirm.
7 5. Walchandnagar industries Ltd ( 10/09/2019 02:47 ) 5)QAP para 4.2:Hydro/pneumatic test:Only pneumatic Test will be performed at our shop for each duct assembly (12 air ducts assemblies per reactor). Please confirm.
8 6. Walchandnagar industries Ltd ( 10/09/2019 02:47 ) 6)Para 4.2 (page 16/20) SCC:Delivery schedule: Progressive delivery and to be completed by 24 months from the date of PO:It is a huge quantum of work and hence, we propose the progressive delivery and to be completed by 24 months for 1st reactor and 36 months for 2nd reactor from the date of PO. Please confirm.
9 7. Walchandnagar industries Ltd ( 10/09/2019 02:47 ) 7)5.6.1 SCC:Terms of payment:Considering procurement of raw material, we propose payment terms as follows – (1) 10% of PO Value against submission of manufacturing drgs. (2) 20% of PO Value against receipt of Plate material at our shop (3) 60% of PO value against receipt of Air duct at site on prorate (Unit / reactor wise) (4) 10% of PO value against receipt of history documents & PBG on prorate (Unit / reactor wise). Please confirm.
10 Akshay S Kulkarni / Manager (C) -FTP ( 10/09/2019 03:27 ) All unanswered queries will be responded to along with the consolidated response to all the queries raised by all the bidders.
11 Akshay S Kulkarni / Manager (C) -FTP ( 10/09/2019 03:29 ) Pre-Bid meeting ends.