Pre-bid Meeting Conversation


Pre-bid meeting Start Time ( 18/03/2021 14:00 )
Pre-bid meeting End Time ( 18/03/2021 14:30 )

Sr.no. User Comment
1 A S Jain / SM (C&MM) -KGS ( 18/03/2021 02:05 ) Welcome in prebid meeting
2 1. Prime Engineering Corporation ( 18/03/2021 02:05 ) Good Noon Sir
3 2. Prime Engineering Corporation ( 18/03/2021 02:10 ) What is the significance of sharing the drawing of frabication details of Tee, Elbow, Duct Support. As per our understanding, these are not part of our scope of supply. Please clarify.
4 3. Prime Engineering Corporation ( 18/03/2021 02:19 ) Please clarify below points / line item of NPCIL Specification KGS-1&2 / 3&4, RAPS-3&4 / 5&6/73180 /2001/DS Point# G-4 (3) : Nature of Application of motor : Motor is safety related. As per our understanding of motor details, it shall be Non-flame proof motor. Please clarify what do you mean by motor is safety related?
5 A S Jain / SM (C&MM) -KGS ( 18/03/2021 02:20 ) Noted. Reply shall be given in due course
6 4. Prime Engineering Corporation ( 18/03/2021 02:25 ) Point# G-9 (7) : Whether seismic qualification of motor and its driven equipment required to be performed? / Method of qualification for motor : Yes, As per IEEE 344 As per our principal, IEEE344 is applicable only for motor and not for motor and fan together. Please clarify what NPCIL wants supplier to perform? (a) Seismic Analysis of motor only as per IEEE 344 or (b) Seismic Analysis of Motor and Fan together? If NPCIL wants seismic Analysis of motor and fan together to perform then which specification of NPCIL to be followed by supplier? Please clarify and provide suitable document to review and consider for seismic qualification.


Sr .No Document Name Date
1    1618910154_56387___56726___REPLY_to_PRE_BID_QUERIES.pdf 20/04/2021 14:45:54